Skip to main content
1,270 ZIP codes in 11 states (888) 555-0123
Deck Building Services

1 covered ZIP code · Wilson County

Deck builders in Mount Juliet, TN

Yes — we build, replace and repair decks in 1 covered ZIP code in Mount Juliet, TN, in Wilson County: 37122. This page uses U.S. Census housing data and NOAA climate normals for this ZIP code to explain what matters for a deck in Mount Juliet specifically — how old the homes are, what the weather does to wood and footings, and which materials hold up best.

Mount Juliet deck facts at a glance

Covered ZIP codes
37122
County
Wilson County
Median year homes built
2003
Homes in covered ZIPs
26,565
Freezing days per year
69
Annual snowfall
4.6 in
Days with rain or snow
87
Suggested decking
light-colored composite or pressure-treated wood

Sources: Census ACS 2020–2024 (housing), NOAA 1991–2020 normals (Old Hickory WFO station). Last reviewed .

How old are homes in Mount Juliet, and what does that mean for a deck?

56% of homes in Mount Juliet's covered ZIP code were built in 2000 or later and 2% before 1960; the largest group dates to the 2010s.

The median home in Mount Juliet was built around 2003. A deck built with a house of that age is now about 23 years old — the stage where first-generation pressure-treated decks commonly need major repair or replacement.

Decks built before 2004 were very likely made with CCA-treated lumber, which was phased out of most residential uses at the end of 2003. That doesn't make an existing deck unsafe, but old boards shouldn't be burned, and demolition debris should be disposed of according to local rules.

That makes Mount Juliet's housing 3 years newer than Wilson County as a whole, where the median home was built in 2000. Statewide, the median Tennessee home was built in 1987. Among the 20 covered Tennessee communities with Census data, Mount Juliet ranks #17 for oldest housing. In this ZIP code, 2% of homes were built before 1960, 15% between 1960 and 1979, 27% between 1980 and 1999, and 56% since 2000 — the single largest group dates to the 2010s.

Homes in Mount Juliet, TN by decade built
Decade builtHomesShare
2020 or later1,7307%
2010s6,81526%
2000s6,33924%
1990s3,65614%
1980s3,63514%
1970s2,4869%
1960s1,4445%
1950s1851%
1940s1230%
before 19401521%

What does Mount Juliet's climate mean for deck construction?

Mount Juliet averages about 69 days a year at or below freezing, 4.6 inches of snow and 53.8 inches of precipitation, based on NOAA 1991–2020 normals.

The nearest NOAA climate station with 1991–2020 normals is Old Hickory WFO, about 6 miles away. It records an average of 69 days a year with a low at or below 32°F — a moderate number of freezing nights. On roughly 60 of those days the temperature climbs back above freezing, so water in wood, soil and gaps between boards repeatedly freezes and thaws.

Frost is less severe in Mount Juliet than in northern states, but footings still have to meet the local frost-depth requirement, and freeze-thaw cycles are enough to work loose nails and open checks in unsealed wood.

Snowfall is light — about 4.6 inches in an average year at Old Hickory WFO — so occasional ice is a bigger concern than snow load. Textured boards and good drainage on stairs help on icy mornings.

Mount Juliet sees about 53.8 inches of precipitation a year, with measurable rain or snow (0.1 inch or more) on about 87 days. Good drainage between boards, clean gaps and a ledger that is properly flashed keep that water from rotting the frame.

Summers are hot: average summer highs are near 87°F, with about 42 days a year reaching 90°F or more. Surface temperature is a real consideration — lighter board colors, shade from the house or a pergola, and heat-mitigating composite lines are worth comparing.

Which decking material makes the most sense in Mount Juliet?

For most Mount Juliet homes, light-colored composite or pressure-treated wood is the strongest starting point because about 42 days of 90°F+ heat make board color and surface temperature important.

Because so many Mount Juliet homes were built after 2000, matching the deck to vinyl or fiber-cement siding and existing trim colors is often part of the material decision.

Decking options for Mount Juliet, TN conditions
MaterialHow it handles Mount Juliet's conditions
Pressure-treated pineEconomical; needs regular cleaning and sealing
CedarAttractive and stable; refinish to keep its color
Capped compositeLow maintenance; choose lighter colors for summer heat
PVCLightest and most moisture-proof; premium price

What kinds of homes are in Mount Juliet, and how does that shape deck design?

Mount Juliet has about 26,565 housing units across its covered ZIP code. 82% are single-family detached homes, 4% are attached homes such as townhouses and rowhouses, and about 14% are in buildings with two or more units. Roughly 80% of occupied homes are owner-occupied.

Detached single-family homes dominate in Mount Juliet, so most decks are backyard decks attached to the rear of the house. That gives more freedom on size, layout and stairs, and makes a well-planned deck one of the most-used rooms of the home.

What deck projects are most common in Mount Juliet?

Based on the age of Mount Juliet's housing, the largest group of projects is likely to be replacing or rebuilding aging decks.

  • Replacement and major repair: about 9,777 homes (37%) were built between 1970 and 1999, the age group whose original or early add-on decks are most likely to have worn-out framing, connectors and boards.
  • Upgrades and expansions: about 8,545 homes (32%) were built since 2010. Their decks are usually sound but small or builder-grade, so enlarging the deck, adding stairs and switching to composite or upgraded railings are common.
  • Retrofit decks on older homes: about 1,904 homes (7%) predate 1970. Here the priority is confirming that add-on decks are properly attached — or rebuilding them freestanding — before any cosmetic work.

When is the best time to plan a deck project in Mount Juliet?

Mount Juliet's milder winters — about 69 freezing nights a year — allow construction through most of the year. Peak summer heat (around 42 days at 90°F+) is the hardest time to apply stain or work in full sun, so many projects are scheduled for spring and fall.

Do you need a permit to build a deck in Mount Juliet?

Often, yes — especially for attached or elevated decks — but the rules are set locally. Check with the building department that serves your address: the municipality, or Wilson County for unincorporated areas.

For Mount Juliet, TN, ask the permit office whether your deck needs a permit based on its size, height and attachment to the house, which drawings and inspections are required. Statewide code background for Tennessee is on our state page; local rules change, so the building department remains the authority.

How does Mount Juliet compare with nearby covered areas?

The closest covered area is Hermitage, about 5.5 miles from the center of Mount Juliet's covered ZIPs. Its median home was built in 1991, 12 years earlier than in Mount Juliet. Mount Juliet has 31 percentage points more detached single-family homes (82% vs. 50%), which changes how many projects are backyard decks versus compact townhouse decks. Owner-occupancy is 80% in Mount Juliet compared with 52% in Hermitage. Mount Juliet's covered ZIP code span about 111.6 square miles of land with roughly 26,565 homes — about 238 per square mile, a low density that usually allows larger decks and freestanding designs.

Covered areas near Mount Juliet, TN
AreaDistanceMedian year builtCovered ZIPs
Hermitage5.5 mi19911
Old Hickory7.9 mi19831
La Vergne11.5 mi20011
Antioch11.8 mi19961
Lebanon12.1 mi20002
Madison13 mi19771

Deck planning checklist for Mount Juliet homeowners

  • Confirm your ZIP code is 37122, the covered Mount Juliet ZIP.
  • Find out when your current deck was built and whether it uses pre-2004 treated lumber.
  • Test board samples in afternoon sun before choosing a color.
  • Probe the ledger, post bases and joist tops for soft wood before planning a resurface.
  • Call 811 before any digging so utility lines are marked.

FAQs

Mount Juliet deck questions

Who can I call for deck building or deck repair in Mount Juliet?

Call (888) 555-0123. We build, replace and repair decks in ZIP 37122 in Wilson County, and the call is the fastest way to confirm your address and talk through the project.

How old is the typical home in Mount Juliet?

The median home in Mount Juliet's covered ZIP code was built around 2003, according to the Census Bureau's 2020–2024 American Community Survey. About 2% of homes predate 1960 and 56% were built in 2000 or later.

How many freezing days does Mount Juliet get each year?

About 69 days a year have a low at or below 32°F at the Old Hickory WFO station (NOAA 1991–2020 normals), and about 60 of them warm back above freezing during the day.

Is composite or wood better for a deck in Mount Juliet?

Light-colored composite or pressure-treated wood is usually the better long-term fit here, because about 42 days of 90°F+ heat make board color and surface temperature important. Wood remains a good lower-cost choice if you are prepared to clean and seal it regularly.

Which county is Mount Juliet in?

ZIP 37122 is in Wilson County, based on the Census Bureau's ZIP-to-county relationship data.

How much does it cost to build or replace a deck in Mount Juliet?

Every deck is priced on its own size, height, materials, railings and stairs, so we don't quote a single number online. In Mount Juliet, the local factors that most often move the price are footing depth set by local frost rules and removal of older decks and ledger or wall repairs on homes built around 2003. Call (888) 555-0123 to talk through your project.

Do you repair or replace old decks in Mount Juliet?

Yes. With 42% of Mount Juliet's homes built between 1960 and 1999 and 2% before 1960, many decks here are old enough to need structural repairs or replacement. We inspect the ledger, framing, footings and railings first, then recommend repair or replacement.

Can you build a composite deck in Mount Juliet?

Yes. Light-colored composite or pressure-treated wood is usually our first suggestion for Mount Juliet because about 42 days of 90°F+ heat make board color and surface temperature important. We also build with pressure-treated wood, cedar and PVC.

Call now: (888) 555-0123